Warning! This data has NOT been reviewed for accuracy.
| Water Control Home Page | Back to Plot Menu Page | Tabulated Data | |
|---|
Plot last updated at : 01:12 hrs - Thu, 12 Mar 2026 |
SUMNER DAM AND LAKE SUMNER
PECOS RIVER
DRAINAGE AREA = 3,917 SQ MI
(1,483 sq. mi. BETWEEN SANTA ROSA DAM AND SUMNER DAM)
VOLUME AREA ELEV. FLOW IN CFS
IN ACRE-FEET IN ACRES IN FEET OUTLET SPILLWAYS
(NAVD88) SERVICE EMERGENCY
TOP OF DAM (1) 260,263 8,219 4,302.88 1,870 60,000 188,000
MAXIMUM POOL 216,508 6,843 4,298.88 1,840 56,000 150,000
EMERGENCY SPILLWAY 140,786 5,724 4,286.88 1,775 43,700 45,000
FUSE PLUG 4 CREST (2)
EMERGENCY SPILLWAY 135,118 5,612 4,285.88 1,770 42,500 37,000
FUSE PLUG 3 CREST (2)
EMERGENCY SPILLWAY 129,562 5,500 4,284.88 1,765 41,000 32,000
FUSE PLUG 2 CREST (2)
EMERGENCY SPILLWAY 124,119 5,382 4,283.88 1,760 39,500 25,000
FUSE PLUG 1 CREST (2)
EMERGENCY SPILLWAY 90,212 4,354 4,276.88 1,700 28,000 0
INVERT & TOP OF CLOSED
SERVICE SPILLWAY GATES (3)
TOP OF WINTER JOINT 61,062 3,436 4,269.40 1,650 11,000 0
USE/BOTTOM OF FLOOD SPACE
(01NOV TO 30APR)
TOP OF SUMMER JOINT 41,062 2,703 4,262.88 1,610 1,400 0
USE/BOTTOM OF FLOOD SPACE
(01MAY TO 31OCT)
SERVICE SPILLWAY & 35,917 2,444 4,260.88 1,600 0 0
TOP OF ACTIVE CONSERVATION (4)
TOP OF INACTIVE 2,500 335 4,232.28 1,200 0 0
CONDUIT INVERT AND 0 0 4,201.88 0 0 0
TOP OF DEAD POOL
COMMENTS
U.S. BUREAU OF RECLAMATION PROJECT
AUTHORIZED SPACE
FLOOD CONTROL 53,000
MIN. CONSERVATION 20,000 (PLUS 20,000 WINTER STORAGE, 1NOV THRU 30APR)
SEDIMENT 64,000
1 INCH OF RUNOFF EQUALS 79,093 AC-FT
EAC TABLE ADOPTED AUGUST 2014
(1) 2014 TABLE EXTENDS TO 4,299.00 NAVD88. TOP OF DAM DATA FROM 1989 EAC
TABLE.
(2) FLOWS BASED ON ALL FUSE PLUGS BEING WASHED AWAY (SILL ELEVATION 4,276.88.
LESSER FLOWS WILL OCCUR BEFORE PLUGS WASH OUT.
(3) RADIAL GATES ON SERVICE SPILLWAY OPEN AUTOMATICALLY ABOVE 4,276.88 AND
ARE FULL OPEN (13 FEET) BY 4,277.38.
(4) MAX CONSERVATION POOL STORAGE LOWERED TO ELEVATION 4,260.88 EFFECTIVE JUNE
2012 IN ORDER TO KEEP WATER OFF OF SPILLWAY GATES TO REDUCE MAINTENANCE.
ALL ELEVATIONS IN NAVD88. SUBTRACT 1.88 FEET TO CONVERT NAVD88 ELEVATIONS TO
PROJECT DATUM. SUBTRACT 2.11 FEET TO CONVERT FROM NAVD88 TO NGVD29.
Channel Capacities:
Santa Rosa Dam to Lake Sumner: 13,000 cfs (Puerto de Luna Gage)
Sumner Dam to Brantley Reservoir: 8,500 cfs
Brantley Dam to Red Bluff Reservoir: 20,000 cfs
Changes in release rates during Flood Control Ops below 4,276.88 will be limited to
1,000 cfs per half hour.
Travel Times:
Santa Rosa to Lake Sumner, 11 hrs
Sumner Dam to Acme Gage, 48 hrs (2 days)