![]() |
Warning! This data has NOT been reviewed for accuracy.
| Water Control Home Page | Back to Plot Menu Page | Tabulated Data | |
---|
![]() Plot last updated at : 23:26 hrs - Thu, 20 Mar 2025 |
BRANTLEY DAM AND RESERVOIR PECOS RIVER DRAINAGE AREA = 17,152 SQ MI (12,208 sq. mi. BETWEEN SUMNER DAM AND BRANTLEY DAM) VOLUME AREA ELEV. FLOW IN CFS IN ACRE-FEET IN ACRES IN FEET OUTLET SPILLWAY (NAVD88) TOP OF DAM (1) 1,194,318 42,525 3309.60 2,087 419,500 MAXIMUM POOL 1,010,547 39,011 3305.10 2,032 357,000 TOP INDUCED SURCHARGE 432,002 23,910 3286.60 1,850 145,000 TOP OF FLOOD CONTROL 384,035 22,524 3284.60 1,788 129,500 TOP OF CONSERVATION 166,227 13,598 3272.60 1,650 40,200 SPILLWAY CREST 62,933 5,522 3261.10 1,450 0 2024 ENTITLEMENT STORAGE 42,835 3,219 3256.37 1,400 0 TOP OF INACTIVE 2,454 391 3229.09 0 0 CONDUIT INVERT 39 19 3212.30 0 0 LOW FLOW OUTLET INLET (2) 0 0 3206.35 0 0 ZERO STORAGE 0 0 3203.60 0 0 COMMENTS USBR PROJECT AUTHORIZED SPACE FLOOD CONTROL 189,700 AC-FT IRRIGATION 40,000 AC-FT SEDIMENT 116,000 AC-FT INACTIVE (RECREATION) 2,000 AC-FT EAC TABLE ADOPTED 2014 (1) TOP OF DAM ELEVATION WITHOUT 0.50 FT CAMBER. (2) FLOW IN OUTLET COLUMN DOES NOT INCLUDE THE LOW FLOW OUTLET WORKS. ALL ELEVATIONS IN NAVD88. SUBTRACT 1.60 FT TO CONVERT NAVD88 TO NGVD29 WHICH IS ALSO THE USBR PROJECT DATUM. |