Date Generated 07 JAN 2025 - 0821                                       Page 1
 
                                     JEMEZ
                                  DAILY REPORT
              (For 24-Hour Period from 0000 to 2400 on 06 JAN 2025)
 _______________________________________________________________________________
 
                        DAILY RESERVOIR OPERATION SUMMARY
 -------------------------------------+-----------------------------------------
              2400 Hour Summary       | Water Yr-Sums     Daily          Yearly
                                      |                CFS      AC-FT     AC-FT
             0000Hrs  2400Hrs  Change | Releases         2.1       4        868
 Elev.(FT)   5125.26  5125.33   0.07  | Evaporation      0.0       0          0
                                      | Unid. losses     0.0       0          0
 Stor(AC-FT)       0        0      0  | Stor. Change     0.0       0          0
                                      | Comp. Inflow     2.1       4        868
 -------------------------------------+-----------------------------------------
                     MINIMUM ELEVATION AND ZERO STORAGE AT ELEVATION 5,133.00
 _______________________________________________________________________________
 
                       0800 - WEATHER DATA - 07 JAN 2025
 
                         PAN     TEMP    TEMP    TEMP     %      %
               PRECIP    EVAP    0800    MAX     MIN     CLD    ICE
              -------   -----    ----    ----    ----   -----   -----
                0.00      .10     27      45      19     40      0
 _______________________________________________________________________________
 
 SPD - Morning Report Data
                 Latest                                      Latest
 Proj.   0000    0800    Rain   Net  Turbine  24hr    24hr    0600
         Elev.   Elev.         Evap.  Gen.   Release Losses  Release
 -----  ------- -------  ----- ----- ------- ------- ------  -------
 00708  5125.33 5125.36   0.00 0.10     0        2.1    0.0     0.0
                 Stor.                                       Stage
                      0                                         1.16
 _______________________________________________________________________________
  Downstream Shift = N/A
 
NOTE:  JEMEZ CANYON DAM IS A DRY RESERVOIR.  USE ELEV. 5133.00 AS A STAFF GAGE.
THE LAKE ELEV. DCP IS SET HIGHER IN THE FLOAT WELL AND CANNOT BE USED. PLEASE
EDIT THE DAILY REPORT EVERYDAY TO ELEV. 5133.00. RUN "RELEV" ROUTINE EVERYDAY.
 
 Gage Readings
   DATE    TIME   ELEVATION   STORAGE    SETTING   SETTING   STAGE   FLOW (cfs)
 --------- ----   ---------   -------    -------   -------   -----   ----------
 05JAN2025 0800    5125.26          0      3.00      3.00     1.13           0
 06JAN2025 0800    5125.26          0      3.00      3.00     1.13           0
 07JAN2025 0800    5125.36          0      3.00      3.00     1.16           0
 


COMMENTS: